Xinhan introduces the installation process of the folding room to you

27 Mar.,2025

The product of the packing box folding house is very simple. It is indeed widely used in the construction industry. It is quick to make and install, beautiful and firm. It has high fireproof and heat insulation properties and flexible installation. It can be pre-installed in the factory or assembled. It can be used for multiple turnovers, and the residual value is increased.

 

The product of the packing box folding house is very simple. It is indeed widely used in the construction industry. It is quick to make and install, beautiful and firm. It has high fireproof and heat insulation properties and flexible installation. It can be pre-installed in the factory or assembled. It can be used for multiple turnovers, and the residual value is increased.

 

The packing box house standardizes all the modules of the house components, and they are all prefabricated in the factory. The production activities are carried out in the factory with environmental control, and are carried out simultaneously with the on-site work, which effectively shortens the construction period. The installation conditions of the packing box house are not affected by bad weather, and it has a long-term involvement in sustainable development, which meets the environmental requirements of the current development form.

What are the construction instructions for the construction of the packing box house on the construction site?

1. The connecting bolts between the components of the packing box house need to be tightened.

2. Gray line layout: according to the position of the living area plan.

3. The bolts must be installed correctly and the washers must be padded according to the design requirements. They must not be installed less or missed.

4. The installation position of each component of the packing box house on the construction site should meet the design requirements, and the position of the on-site welding components should be accurate, without false welding or leaking welding.

5. After on-site welding and transportation, the peeling primer of the packing container room should be re-painted with a layer of anti-rust paint, and the exposed parts of the components should be painted with two layers of topcoat. The paint should not be missed, peeled, hung, or rusted.

6. The container office and wall should be corrected according to the layout diagram. The corners and positive corners of the umbrella wall should be sealed with angle aluminum. The connection between the boards should be connected with I-beam aluminum. The walls should be vertical, the caulking depth should be consistent, neat and clean. The wall should be clean and the color should be consistent. The board seams should be neat. The nailing surface should be consistent from top to bottom and there should be no staggering. Self-tapping bolts should be used in necessary parts.

7. The position of doors and windows in the packing container room should be marked according to the design drawings, and the position of the door and window holes should be cut with a cutting machine. The windows and doors should be installed according to the position of the door and window holes. The windows are plastic steel windows, and the ceiling of the bottom floor should be installed.

8. The doors and windows of the packing container room should be installed correctly and fastened with bolts. The door and window positions should be opened flexibly without obstruction. The glass should not have pockmarks and cracks. The glass should be clean and the accessories should be installed firmly.

9. The floor slabs of the packaging container room should be laid with mortar. Slabs with cracks between them are not allowed to be installed and used. The surface of cement or fine stone concrete should be compacted and polished. Cracks, peeling, sand and other defects are not allowed.

 